Save Time & Money on the Jobsite by Specifying Bolt-In, Adjustable Rooftop Equipment Frames
QuickFrames are pre-engineered, bolt-in, adjustable rooftop unit, HVAC and mechanical equipment support frames. No welding needed. Safer, faster, affordable alternative to welded angle iron.Specify Bolt-in, Adjustable Rooftop Unit / HVAC Support Frames
Mechanical locations often change and customers have to make quick decisions, or parts of the project get delayed due to steel fabricator backlogs. Every minute in that process is time and money lost.
Specifying QuickFrames on your commercial building plans means your customers can easily bolt-in our adjustable rooftop unit support frames below the deck fast… in about 15 minutes. And if changes happen, they’re just as fast and easy to move.
QuickFrames also…
- Work with any rooftop unit / HVAC equipment
- Are also perfect for floor penetrations and roof openings
- Install below the deck in about 15 minutes
- Eliminate the risk of spark and fire hazards
- Easily adjust in size and location
- Save time and money on any job
Sign up to schedule your free NCSEA CE course
Complete the form and we'll follow up to coordinate your free courseCheck out our demo video to see just how fast and easy QuickFrames are to install.
Compare Our Framing Systems
Choose from (3) types of QuickFrames Framing Systems and compare to traditional welded angle iron.Used For
Applications
Availability
Install Method
Install Sequence
Frame Assembly
In-field Adjustable
Relocatable / Reusable
Detailing Required
Engineering
Trade Coordination
Fire Safety Required
Total Cost During Project
Bolt-in & Adjustable
Pre-engineered for all project types
Assemble in place
All framing needs
RTUs, AHUs, CUs
Powered Fans, Vents
Skylights, Solar Tubes
Roof Hatches
Roof Drains
Floor Openings
Your Text
Next Day
Bolt-on
Before / After Deck
Assembles in place
Fully Adjustable
(telescoping rails)
Yes / Yes
No
Site Specific Available
Minimized
No
Pre-Engineered Drop-Ins
Fully assembled, weldable
New construction only
Frames before decking
RTUs, AHUs, CUs
Powered Fans, Vents
Skylights, Solar Tubes
Roof Hatches
Roof Drains
Day After Receiving Drawings
Welded
Before Deck
Pre-assembled
Partial
(cross rails only)
Partially / Partially
Yes
Site Specific Available
Traditional
Yes
$$
vs. Welded Angle Iron
Traditional welded angle iron requiring fabrication & detailing
All framing needs
RTUs, AHUs, CUs
Powered Fans, Vents
Skylights, Solar Tubes
Roof Hatches
Roof Drains
1 Week ( + )
Welded
Before Deck or $$$$$$
Pre-assembled
None
No / No
Yes
Site Specific Required
Traditional
Yes
$$$